Pull requests can't verify the target warehouse is actually ready.
Pipeline Promotion
Move a certified pipeline from dev to prod through a request-approve-execute workflow with separation of duties.
Other tools treat promotion as a code-review problem. BoltPipeline treats it as the highest-risk operation in data engineering. A developer requests, an admin approves, an operator executes — and the same person can never do all three. The target environment re-certifies against its own schema, catching issues before they hit production.
What it solves
Common problems this capability removes from your engineering workflow.
The author of a change merges their own change to production.
Copied DML references the source environment's columns and widths.
There's no audit trail tying a deploy to who actually shipped it.
How it works
The flow this capability runs end-to-end inside the platform.
- 1Developer requests promotion from a successfully-running pipeline.
- 2Admin approves; a different operator executes — never the same person.
- 3Source SQL is copied to the target env with FQN tokens rewritten.
- 4Target-env certification regenerates DML against the real target schema.
Related capabilities
Other capabilities in the BoltPipeline platform that work alongside this one.
Environment FQN Mapping
One logical table identity spans every environment — promotion, drift compare, and lineage stay continuous.
5Security &RBAC and Settings
One permission engine drives every authorize check — and the UI renders only what the server says you can see.
1Intelligent PipelinePlan, Enrich, Certify, Operate
One lifecycle takes your SQL from upload to live data load — every check runs before the first row moves.
See it on your data.
Try BoltPipeline against your live database — your data never leaves your environment.